Foundations finnished at Tahkoluoto

The jack-up vessel Vole au vent has installed the last of the gravity based foundations at the Finnish Tahkoluoto offshore wind farm. The vessel is now being loaded out with components for the installation of the Siemens turbines. All the turbines are expected to be in place by mid-July for commercial operation by September 2017.