First bolted connection for Ørsted

09.2018 - PES Magazine - First bolted connection for Ørsted: "Jan De Nul Group was contracted by Ørsted to transport and install 36 monopile foundations and the scour protection works around all 56 foundations for the Borkum Riffgrund 2 offshore wind farm. The cable installation works connecting the OWF to the offshore substation were also executed by Jan De Nul on behalf of TenneT. Thus, proving the efficiency of a bolted connection between MP and TP."