LZ
Ørsted Wind Power A/S and Jan De Nul Group announce the signing of the final contract for the transport and installation of 107 monopile foundations and ...
LZ
Jan De Nul Group has selected Remazel S.p.A. for the delivery of a set of monopile cradles, a skidding system and an upending hinge for Les Alizés.
WDV op F2
Jan De Nul’s Cable Laying Vessel Willem de Vlamingh has successfully installed the four export cables with a total length of 34km on the 376MW Formosa 2...
Voltaire
Dogger Bank Wind Farm and Jan De Nul Group announce the signing of the final contract for the transport and installation of 87 GE Haliade-X 14 MW ...
LesAlizes
Jan De Nul Group has selected Imeca, a trade mark of REEL SAS, for the delivery of a highly advanced electrical Motion-Compensated Pile Gripper for its ...
TPC
Jan De Nul Group completed the installation of all 21 offshore wind turbines for the 109.2 MW Taiwan Power Company Offshore Windfarm.
VV
Jan De Nul Group installs a total of 72 wind turbines of 8.4MW each on behalf of Vattenfall Denmark. All together, these turbines will produce enough green ...
IN
For the very first time in history, the island of Crete has been connected to the Greek mainland by means of a subsea electricity link.
Kriegers Flak halfway
Jan De Nul halfway through installation of 600 MW Kriegers Flak wind farm