Maintenance dredging works in the marinas of Nieuwpoort set new sustainability standards
The maintenance dredging works in the marinas of Nieuwpoort in Belgium, got underway. What makes this project so unique, are the CO2-reducing measures.
Jan De Nul orders second next generation offshore installation vessel Les Alizés
Jan De Nul Group orders Les Alizés, a floating installation crane vessel from the CMHI Haimen shipyard in China.
Jan De Nul is aiming for 100% renewable fuel
Jan De Nul Group carries out dredging work in the Benelux with 100% renewable fuel.
Jan De Nul drives forward at Formosa 2
After award of EPCI of foundations and subsea cables for the Formosa 2 OWF, Jan De Nul Group is on track with all project preparations.
Landmark achievement for Jan De Nul in Asia
Jan De Nul Group completes Formosa 1 Phase 2 Offshore Wind Farm scope.
Voltaire secured for Dogger Bank Wind Farms
The world’s largest offshore wind farm, Dogger Bank Wind Farms, is delighted to welcome Jan De Nul’s Voltaire to the project.
Jan De Nul enters French renewables market
JDN will be responsible for the transportation and installation of 80 Offshore Wind Turbines on the 480MW Saint-Nazaire Offshore Wind Farm (OWF)
All foundations on Formosa 1 Phase 2 installed
Jan De Nul Group has successfully completed installation of all twenty foundations on the 120MW Formosa 1 Phase 2 wind farm in Taiwan.
Jan De Nul bags 600MW Kriegers Flak contract
Jan De Nul Group signs a contract with Vattenfall Vindkraft Kriegers Flak P/S for the transport and installation of 72 8.4MW Siemens Wind Turbine Generators