The contract between Jan De Nul and Vattenfall includes the design, engineering, manufacturing, procurement and delivery of the Sea-Fastening. Jan De Nul will also be responsible for the engineering of the RAMS for the marine operations related to the wind turbine installation, as well as the transport and installation of the 41 Siemens Gamesa wind turbines with the jack-up installation vessel Vole au vent.