Swordfish
Jan De Nul orders highly powered versatile trenching vehicle Swordfish
Brug
Today, a Jan De Nul team installed the central part of the new Suzan Daniel bridge over the Brussels-Scheldt Canal in the heart of Brussels.
Kriegers Flak halfway
Jan De Nul halfway through installation of 600 MW Kriegers Flak wind farm
Kortrijk Bustunnel
1,500-tonnes bus and bicycle tunnel to be slid into place
Soil wash Luik
Jan De Nul is a pioneer in Wallonia with the first physical-chemical soil remediation installation
ULEv
Bureau Veritas (BV), a world leader in testing, inspection, and certification, has developed a new notation to recognize the performance of ULEv.
Sustainable beach replenishments
Jan De Nul Group is the first dredging company to carry out 100% sustainable beach replenishments. Moreover, at the Belgian coast
Jan De Nul further contributes to the Oosterweel Link in Antwerp
Jan De Nul further contributes to the Oosterweel Link in Antwerp
TSHD Ortelius Jan De Nul Group
The Singaporean shipyard Keppel Offshore & Marine Ltd., successfully delivered the 6,000 m3 Trailing Suction Hopper Dredger Ortelius to Jan De Nul Group.