Maintenance dredging works in the marinas of Nieuwpoort set new sustainability standards
The maintenance dredging works in the marinas of Nieuwpoort in Belgium, got underway. What makes this project so unique, are the CO2-reducing measures.
Prince Hendrik Sand Dike
Nature Based Solutions to strengthen biodiversity. The dyke has been reinforced in a unique way: sand in combination with nature development.
CO2 performance ladder level 5
The CO2 performance ladder is a system that helps organisations to reduce their CO2 emission.
Jan De Nul orders second next generation offshore installation vessel Les Alizés
Jan De Nul Group orders Les Alizés, a floating installation crane vessel from the CMHI Haimen shipyard in China.
Jan De Nul is aiming for 100% renewable fuel
Jan De Nul Group carries out dredging work in the Benelux with 100% renewable fuel.
Jan De Nul drives forward at Formosa 2
After award of EPCI of foundations and subsea cables for the Formosa 2 OWF, Jan De Nul Group is on track with all project preparations.
De Nul-O-Plastic
Cleaning up millions of plastic particles without disturbing nature? Challenge accepted!
Landmark achievement for Jan De Nul in Asia
Jan De Nul Group completes Formosa 1 Phase 2 Offshore Wind Farm scope.
Voltaire secured for Dogger Bank Wind Farms
The world’s largest offshore wind farm, Dogger Bank Wind Farms, is delighted to welcome Jan De Nul’s Voltaire to the project.