Multipurpose vessel Adhémar de Saint-Venant remotely controlled the underwater robot UTV1200 that buried the cable in the seabed.
Cable-laying vessel Isaac Newton, multipurpose vessel Adhémar de Saint-Venant and a remotely-controlled cable burying vehicle of consortium ...
Voltaire
The largest offshore jack-up installation vessel ever built, Voltaire, has just arrived in the port of Able Seaton, UK. Voltaire of Jan De Nul Group was ...
Voltaire
Jan De Nul Group has signed an agreement with RWE, a German energy provider, for the long-term chartering of two next-generation installation vessels for ...
Cable-Laying Vessel Connector will install the Pentland Firth interconnector between Orkney Island of Hoy and Scotland
In November 2022, Jan De Nul Group signed a contract with Scottish and Southern Electricity Networks (SSEN) Distribution to supply and install in summer 2023 a
Jan De Nul’s CLV Connector, CLV Isaac Newton, and TSV Symphony preparing for new projects.
Jan De Nul Group, LS Cable & System, and Denys NV have been awarded a 525 kV HVDC cable system portfolio for the German electricity grid by TenneT. BalWin 4, La
Cable Laying Vessel Connector will transport and install the cables
Jan De Nul Group in partnership with Hellenic Cables has been awarded by RWE the turnkey delivery of both the export cable as well as inter-array cable systems
The visitors of the Connector
Vorig jaar besloten vier landen om fossiele brandstoffen om te zetten naar hernieuwbare energie gewonnen op de Noordzee. Nu, in 2023, sluiten zich daar nog eens
The Zonneberg site is ideally located in Zelzate
Jan De Nul Group, DEME Group, and Aertssen Group in JV Terranova join forces with Luminus and Nippon Gases to build an installation for green hydrogen.
Wagenborg Barge 8 transported the first monopiles
JDN starts works on Borkum Riffgrund 3 and Gode Wind 3, Les Alizés will install monopile foundations.