Provinciehuis Namen
Every building needs a builder as its father and a designer as its mother. That is why Jan De Nul, together with engineer and architect Dr Philippe Samyn M Sc.,
Scheldt Tunnel Oosterweel Link
Dredging, hydraulics and civil engineering go well together: Scheldt Tunnel Oosterweel Link
CO2 PSL
JDN continuously strives to reduce its environmental footprint, through an intensive energy management system focussing on lowering energy consumption
Jan De Nul Group - Nieuwbouwzondag
Book your visit time in advance for a Corona-proof visit !
Weir lock Aalst
Soetaert, as main contractor, is helping to lay the foundations for a new weir lock on the Dender.
Foundations on land and at sea
We attach great importance to exchanging knowledge between different departments. That is why we brought together two experts in foundation techniques.
S-building
In 2017 the General City Hospital (A.S.Z.) started the construction of a new S-building.
Leiewerken Harelbeke nominated for Publica Awards
We kicked off 2020 in January with the festive inauguration of the water infrastructure works on and around the weir lock complex along the Lys in Harelbeke.
SVK Nieuwpoort
Jan De Nul arms Belgian coast against the force of nature